Reorder point formula: when to restock, with examples

How to calculate the reorder point and safety stock for each product, with worked examples, a service-level table and the mistakes that leave shelves empty.

Clientlly teamUpdated 3 min read

Key takeaways

  • Reorder point = average daily usage × lead time in days + safety stock.
  • Safety stock covers the days when you sell more than usual or the supplier is late.
  • Simple safety stock = (maximum daily usage × maximum lead time) − (average daily usage × average lead time).
  • Recalculate reorder points at least every quarter, and for every product whose sales or supplier changed.
On this page

The reorder point is the stock level at which you place a new order, so the goods arrive before you run out. The formula is:

Reorder point = average daily usage × lead time (days) + safety stock

If you sell 4 boxes of toner a day, the supplier needs 7 days to deliver, and you keep 32 boxes as a buffer, you reorder when stock falls to 4 × 7 + 32 = 60 boxes.

The three numbers you need

TermMeaningWhere to find it
Average daily usageHow many units you sell or use per daySales of the last 60–90 days ÷ number of days
Lead timeDays from placing the order to having the goods on the shelfYour past purchase orders and deliveries
Safety stockExtra units kept for surprisesCalculated below

Use working days or calendar days consistently. If the warehouse is closed at weekends, count working days for both usage and lead time.

How to calculate safety stock

Method 1: the simple max–average formula

Safety stock = (maximum daily usage × maximum lead time) − (average daily usage × average lead time)

It needs no statistics and works well for most small businesses.

Example: toner sells 4 boxes on an average day and 6 on a busy day. Delivery usually takes 7 days, but has taken 10.

  • Worst case: 6 × 10 = 60
  • Normal case: 4 × 7 = 28
  • Safety stock = 60 − 28 = 32 boxes
  • Reorder point = 28 + 32 = 60 boxes

Method 2: the service-level formula

If you have enough sales history, you can choose how often you accept running out:

Safety stock = Z × standard deviation of daily demand × √lead time

Z depends on the service level, the share of order cycles in which you do not run out:

Service levelZ
90%1.28
95%1.65
98%2.05
99%2.33

Example: daily demand varies with a standard deviation of 1.5 boxes, lead time is 9 days, and you want 95%. Safety stock = 1.65 × 1.5 × √9 = 1.65 × 1.5 × 3 ≈ 7.4, so keep 8 boxes.

Worked examples for three products

ProductDaily usageLead timeSafety stockReorder point
A4 paper (boxes)103 days1545
Toner cartridges47 days3260
Air conditioner units0.521 days414.5, so 15

Products with long lead times need a high reorder point even when they sell slowly.

Reorder point vs. how much to order

The reorder point tells you when to order. How much to order is a separate decision. A common starting point is the economic order quantity (EOQ):

EOQ = √(2 × annual demand × cost per order ÷ annual holding cost per unit)

If you sell 1,000 boxes a year, each order costs €20 to place and receive, and holding one box for a year costs €4, then EOQ = √(2 × 1,000 × 20 ÷ 4) = √10,000 = 100 boxes. Minimum order quantities and supplier discounts often override the formula, but it gives you a sensible baseline.

Common mistakes

  1. One reorder point for everything. Each product needs its own, based on its own sales and supplier.
  2. Using last year's numbers forever. Demand and lead times change; recalculate at least quarterly.
  3. Ignoring seasonality. Raise reorder points before your busy season, not during it.
  4. Counting stock that is reserved for orders already accepted as available.
  5. Checking stock by hand. A reorder point only works if someone sees when it is reached.

How Clientlly helps

In Clientlly you set reorder rules per product and warehouse. Stock moves automatically with every sale and purchase, you get a low-stock notification when an item reaches its reorder point, and reorder suggestions show what to buy and how much. See the inventory module.

Frequently asked questions

What is a reorder point?

The stock level at which you place a new order, so the goods arrive before you run out. It equals average daily usage times lead time, plus safety stock.

How much safety stock should I keep?

A simple rule is (maximum daily usage × maximum lead time) − (average daily usage × average lead time). Keep more for products whose absence stops sales, less for everything else.

What is the difference between reorder point and minimum stock?

They are often used as the same thing: the level that triggers a new order. Some businesses also keep a lower minimum that must never be crossed, equal to the safety stock.

How do I find my supplier's lead time?

Compare order dates with delivery dates on your last purchase orders. Use the average for the normal case and the longest one for the worst case.

Bring your business workflows together